Solid Waste Demolition Guidelines

< Back to Policy List

It is required that all buildings to be demolished be inspected by a licensed asbestos inspector prior to demolition. A report from this inspection must be on file at the Transfer Station prior to the Transfer Station being able to accept material from the demolition site.

Municipal Solid Waste (MSW) and Household Materials must be removed prior to demolition of trailer houses and building structures before disposal in the county construction and demolition pit.

Click here for more info.

< Back to Policy List

RAD Curbside © 2021 All rights reserved.

Website design by Dawn Creative.